Polk County Highway Department

Welcome, Guest!
Log in | Employee Login | License
 

Bid Abstract

060-610-013 - CSAH 10Knife River Materials Agassiz Asphalt, LLC RJ Zavoral & Sons, Inc. 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2104.502REMOVE METAL APRONEACH1$75.00$75.00$100.00$100.00$110.00$110.00
2104.503REMOVE CONCRETE CULVERTL F36$75.00$2,700.00$60.00$2,160.00$680.00$24,480.00
2104.503REMOVE METAL CULVERTL F40$30.00$1,200.00$10.00$400.00$11.00$440.00
2104.503REMOVE CABLE GUARDRAILL F1,700$3.75$6,375.00$2.25$3,825.00$7.00$11,900.00
2104.503REMOVE CHAIN LINK FENCEL F50$6.00$300.00$3.50$175.00$7.00$350.00
2104.504REMOVE BITUMINOUS PAVEMENTS Y3,800$2.00$7,600.00$4.00$15,200.00$5.00$19,000.00
2104.507REMOVE RIPRAPC Y200$16.00$3,200.00$10.00$2,000.00$13.00$2,600.00
2105.507COMMON EXCAVATION (P)C Y342$6.50$2,223.00$20.00$6,840.00$86.75$29,668.50
2105.507COMMON BORROW (LV)C Y6,400$12.00$76,800.00$8.50$54,400.00$15.00$96,000.00
2105.604GEOGRIDS Y5,700$2.25$12,825.00$3.00$17,100.00$3.00$17,100.00
2211.509AGGREGATE BASE CLASS 5 MODTON2,300$13.70$31,510.00$17.50$40,250.00$17.00$39,100.00
2221.509SHOULDER BASE AGGREGATE CLASS 5 MODTON100$34.75$3,475.00$30.00$3,000.00$18.00$1,800.00
2232.504MILL BITUMINOUS SURFACE (1.5")S Y7,200$2.00$14,400.00$3.70$26,640.00$2.00$14,400.00
2360.509TYPE SP 9.5 WEARING COURSE MIX (2,B)TON1,800$105.00$189,000.00$110.00$198,000.00$88.00$158,400.00
2451.507GRANULAR BACKFILL (LV)C Y500$15.00$7,500.00$14.00$7,000.00$15.00$7,500.00
2511.507RANDOM RIPRAP CLASS IIIC Y85$60.00$5,100.00$75.00$6,375.00$95.00$8,075.00
2531.503CONCRETE CURB & GUTTER DESIGN B624L F1,600$24.75$39,600.00$30.00$48,000.00$27.00$43,200.00
2563.601TRAFFIC CONTROLLS1$2,300.00$2,300.00$4,000.00$4,000.00$3,665.00$3,665.00
2573.503FLOTATION SILT CURTAIN TYPE STILL WATERL F200$13.00$2,600.00$14.00$2,800.00$13.00$2,600.00
2573.503SILT FENCE, TYPE PAL F1,800$1.10$1,980.00$1.25$2,250.00$1.10$1,980.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F1,800$2.50$4,500.00$2.60$4,680.00$2.50$4,500.00
2574.507COMMON TOPSOIL BORROWC Y200$30.00$6,000.00$20.00$4,000.00$23.00$4,600.00
2575.508HYDRAULIC STABILIZED FIBER MATRIXLB5,075$1.21$6,140.75$1.25$6,343.75$1.50$7,612.50
2580.503INTERIM PAVEMENT MARKINGL F210$1.04$218.40$5.00$1,050.00$4.00$840.00
2582.5034" SOLID LINE PAINTL F5,200$0.33$1,716.00$0.35$1,820.00$0.50$2,600.00
2582.5036" SOLID LINE PAINTL F5,200$0.38$1,976.00$0.40$2,080.00$0.50$2,600.00
2582.603PAVEMENT MARKING SPECIALL F3,300$0.98$3,234.00$1.00$3,300.00$1.00$3,300.00
 Totals for project 060-610-013 $434,548.15 $463,788.75 $508,421.00
 
Contract Total:$434,548.15$463,788.75$508,421.00