Polk County Highway Department

Welcome, Guest!
Log in | Employee Login | License
 

Messages

Change in Contract Construction Status

STATE AID FOR LOCAL TRANSPORTATION

CHANGE IN CONTRACT CONSTRUCTION STATUS

 

County/City  Polk County Highway Department

 

NOTE:  All dates are to be the actual dates on which the status of the contract has changed.  Use a separate form for each date reported.
 

1. (Low) SP/SAP No. SAP 060-610-013             2. Fed. Proj. No.    

3. Contract No.
 1264  

 

4. Location  CSAH 10 East Shore 

 

5. Type of Work       Grading, Aggregate Base, Curb and Gutter, and Bituminous Surfacing 

 

6. Contractor       Knife River Materials 

 

STATUS OF ENTIRE CONTRACT

 

7.  Date Notice to Start: June 25th , 2019_      8. Date Work Started                           (First date ANY work performed)

9. Date Suspended    Reason   
         
(If not the last date of work at suspension, or if the suspension is not authorized by the Engineer, please explain in Remarks.)

 

10. Date Resumed    Reason   
         
(If not first date of work at resumption, e.g., if the contractor fails to resume work following notification of end of suspension period, please explain in Remarks.)

 

11. Date Opened to Traffic                                                                               

                                                                         

12. Liquidated Damages Waived After                 as Documented by_______________________________

                                                                         

13. Semi-Final Completion Date                         (The date on which all work was completed except that work exempted by the Special Provisions. If the Special Provisions exempt no work, no Semi-Final Completion Date can be declared.)
14. Expiration date of vegetation maintenance period                                  When a Semi-Final Completion Date has been declared and the only remaining work is vegatation maintenance, no further Weekly Diaries need to be submitted until the Final Completion Date. In all other cases, diaries are required thru the Final Completion Date.

15. Final Completion Date                                      (The Date on which all construction obligations of the Contractor were completed including maintenance and final cleanup.)

 

 

 

STATUS OF INTERMEDIATE COMPLETION PORTIONS, BRIDGES, OR PROGRESS-CONTROLLING-OPERATION

 

16. Special Provision

     

17. Bridge No.

     

18. Progress-Controlling-Operation

     

19. Date Started

     

20. Date Suspended

     

21. Date Resumed

     

22. Date Open to Traffic

     

23. Date Completed

     

REMARKS:                                                                                                                                                                   

                                                                                                                                                                                    

                                                                                                                                                                                    

                                                                                                                                                                                    

                                                                                                                                                                                   

Date Prepared

<[SIGN 1 DATE]>

Project Engineer

<[SIGN 1 NAME]>

Signature

<[SIGN 1]>

DISTRIBUTION:         Contactor (1)  Co/City/Project Engineer (1)  District State Aid Engineer (1)